We build BIM coordination platforms, project controls suites, and IoT-powered site intelligence tools that give construction firms the digital infrastructure to deliver complex projects with precision and confidence.
Every successful digital construction programme rests on coordinated models, controlled projects, and connected sites — mastered together, not in silos.
Author, coordinate, and validate federated BIM models across all disciplines — from concept through handover — with a fully managed digital delivery workflow.
Keep cost, programme, and documentation tightly integrated so every stakeholder has a single source of truth for project performance at every stage.
Connect physical construction progress to digital models using IoT sensors, computer vision, and real-time dashboards that flag safety and productivity issues before they escalate.
The problems that erode margins and reputation in construction are well-known. The technology to fix them is available today. We connect the two.
Rework costs up to 30% of project budgets
Clash detection and model coordination catch conflicts before groundbreak, eliminating the costly rework cycles that erode contractor margins and delay programmes.
No real-time visibility into cost and schedule
Live dashboards connect cost, schedule, and document data so project managers spot deviations the moment they happen — not weeks later in a monthly report.
Safety incidents increase as complexity grows
Sensor networks and computer vision monitor site conditions continuously, flagging near-misses and unsafe behaviours before they become recordable incidents.
Purpose-built modules that integrate into a unified construction intelligence platform — deployable individually or as a complete suite.
Federated model management across all disciplines and design stages.
Automated interference checking with issue assignment and resolution tracking.
4D BIM-linked programmes with critical path and lookahead views.
Budget tracking, change management, and earned value reporting in one place.
ISO 19650-compliant CDE with version control, transmittals, and approvals.
IoT-driven site safety dashboards with incident prediction and alerts.
Our platforms and delivery processes are aligned to international BIM and construction management standards so your projects meet client, regulatory, and audit requirements without rework.
A structured four-stage process that takes your project from initial briefing through to a fully data-rich handover — with complete auditability at every step.
Define project information requirements, agree on data standards, and author a fully scoped BIM Execution Plan.
Build discipline models, federate them into a common data environment, and run structured clash detection sprints.
Link the federated model to the live programme, activate IoT sensors, and track physical progress against the 4D BIM baseline.
Deliver COBie data, as-built BIM, and O&M documentation so the asset owner is ready for facilities management from day one.
Listing platforms, property CRMs, and transaction workflows for residential and commercial real estate.
Explore Real EstateSmart factory platforms, MES integration, and digital twin solutions for industrial manufacturers.
Explore ManufacturingDesign collaboration tools, BIM authoring workflows, and portfolio management for architecture practices.
Explore ArchitectureCommon questions about our services for Construction & AEC.
Yes. We manage federated BIM coordination across architectural, structural, MEP, and civil disciplines using a Common Data Environment aligned to ISO 19650 standards. Our clash detection process runs on a defined sprint cycle, with all issues tracked, assigned, and resolved before they reach the construction phase.
Our project controls platform integrates cost, programme, and document workflows into a single source of truth. Earned Value Management calculations update automatically as progress is recorded, so project managers see forecast-at-completion deviations in real time rather than discovering them in monthly reports.
Yes. We link federated Revit or IFC models directly to Gantt and critical path schedules, creating 4D simulations that visualise construction sequences, identify spatial conflicts between trades, and communicate programme logic to site teams and clients in a format everyone can understand.
We deploy IoT sensor networks covering temperature, vibration, noise, access control, and structural monitoring. All sensor data feeds into a real-time site intelligence dashboard with configurable alert thresholds. Safety analytics identify near-miss patterns before they result in recordable incidents.
COBie export is integrated into our model authoring workflow from the start of detailed design rather than added at handover. We validate COBie data at each major project milestone and produce structured data drops that satisfy both client asset management requirements and facilities management software imports.
Yes. We build API integrations with Procore, Aconex, Autodesk Construction Cloud, and custom CDE platforms. Our integration layer synchronises document transmittals, RFI responses, and issue registers bidirectionally so your project team never has to maintain data in two places.
BIM coordination for an active project can be operational within two to three weeks of engagement. A full project controls and site intelligence platform — including IoT sensor deployment, 4D BIM linking, and CDE integration — typically takes six to ten weeks depending on site complexity and stakeholder onboarding requirements.
Whether you are managing a single complex development or a multi-site programme, we have the BIM expertise and project controls technology to help you deliver on every commitment.